Los Angeles Soft-Story Retrofit Program Explained

Los Angeles Soft-Story Retrofit Program Explained
Picture of YDGROUP
YDGROUP

In 2015, Los Angeles Seismic Retrofit Ordinance was implemented by the city council, bringing the issue of seismic building safety to the public eye. Ordinance 183893 and 184081 define the buildings at risk, the steps necessary to reinforce them, and a timeline for project completion. The main goal of the program is to address the issue of structural deficiencies in buildings that have tuck-under rooms, such as parking spaces or garages, without proper structural support. These deficiencies pose a serious risk in the case of a natural disaster, as the city has witnessed in the past.

This page covers the mandatory program, which applies to multi-unit buildings. If you own a single-family house, your retrofit is voluntary and works differently: see seismic retrofit in Los Angeles for the homeowner path and the grant funding attached to it.

 

Safety Risks in Soft-Story Buildings

The full extent of structural risks in such buildings was revealed during the Northridge Earthquake, which struck the neighborhood of Reseda on January 17, 1994. The earthquake was recorded as 6.7 Richter magnitude, classifying it as strong on the scale, and caused widespread structural damage and loss of life. Many soft-story buildings in the Reseda neighborhood collapsed, notably the Northridge Meadows apartment complex, where sixteen residents tragically lost their lives.

After the earthquake catastrophe, it was clear that soft-story buildings had a greatly larger rate of structural failure compared to others, even those right next to them.

 

Definitions of Soft-Story Buildings and Lateral Force

The clear indicator of a soft-story building is the lack of structural support on the first several stories, leaving them susceptible to lateral collapse. Inadequate structural support consists of wood-frame construction, lack of reinforcement, and especially ground floor openings such as garage doors or expansive windows. Such structural design commonly isn’t able to withstand lateral forces – those that influence a building side to side.

Lateral force can be observed in cases of natural disaster, such as when the building shakes during earthquakes, or in exceptional cases, from the force of strong storm winds. If the first floor experiences structural failure due to lateral forces, the upper floors usually freefall directly on top of it with crushing effect.

 

Los Angeles Seismic Ordinance 183893 and 184081 Explained

The ordinance identifies soft-story building characteristics that constitute a safety and life hazard, and aims to help owners properly address these issues inside the retrofit program, keeping in mind that these mandatory solutions should be affordable and easy to implement.

The Program of Soft-story Retrofit Applies to:

  • Buildings of wood-frame construction with two or more stories, permitted or constructed before January 1, 1978
  • Buildings where the ground floor contains an open space, such as a parking area
  • Buildings with four or more dwelling units

The program also defines a priority plan, detailing the order of importance in addressing buildings with structural deficiencies. In the order of top importance, they are the following:

  • Priority I – Buildings with 16 or more dwelling units
  • Priority II – Buildings with less than 16 dwellings units, but three or more stories
  • Priority III – Buildings which do not fall into Priority I or Priority II

Soft-Story Retrofit Action Plan According to Ordinance 184081

To comply with the retrofit program, the building owner is required to submit the building to professional structural analysis. If the analysis concludes that there are deficiencies, it’s necessary to find and propose alterations that meet the program requirements. If these alterations are feasible, the building will be issued a permit for rehabilitation. In circumstances where alterations or improvement is not feasible, the building will be planned for demolition.

The clock runs in three stages, all measured from the date the Order to Comply is served. Within two years, the owner must submit plans for retrofit or demolition. This first deadline is the one owners most often underestimate, because the structural assessment and engineering all have to be completed inside it.

The program then allows three and a half years from the same date to obtain all necessary permits for rehabilitation or demolition. The eighteen months between the two deadlines exists to absorb plan check corrections.

Within seven years after serving the compliance order, complete construction or demolition must be completed.

At this point, the building will have fully complied to the ordinance, and became much safer for work and living.

 

What the Retrofit Physically Involves

There is no single solution that fits every soft-story building. The correct approach depends on the layout of the ground floor, how much of it is open, and what the upper stories weigh. In practice the work usually comes down to three methods, often combined.

  • Steel moment frames. Installed around the garage or storefront opening. These carry the lateral load while keeping the opening wide and usable, which matters when the ground floor is tenant parking you cannot afford to lose.
  • Plywood shear walls. Structural sheathing applied to stiffen existing wall lines where there is enough solid wall to work with. Less intrusive and less expensive than steel where the geometry allows it.
  • Foundation connections. Brackets and epoxy anchors tying the new frame into the existing foundation, so the reinforcement actually transfers load rather than sitting on top of a weak connection.

The engineering decides which of these applies and where. Over-specifying steel is a common way for a retrofit to cost far more than it needed to.

Burbank adopted its own ordinance in December 2024, and its schedule works differently: every covered building runs on the same fixed dates, with retrofit drawings due January 11, 2027. Our guide to the Burbank soft-story retrofit lays out those deadlines.

 

Single-Family Homes With Rooms Over a Garage

The ordinances cover wood-frame multifamily buildings, but the same weakness shows up in many single-family houses: a bedroom or a primary suite built over an open two-car garage. The garage front is mostly opening, so the ground floor is far more flexible than the rooms above it. In strong shaking it can rack sideways and let the upper floor drop, the failure seen in the 1989 Loma Prieta and 1994 Northridge earthquakes.

For a house, the retrofit is voluntary. Nobody will order it, and there is no deadline. The fix is usually the same as on an apartment building at a smaller scale: a steel moment frame or a cantilevered column around the garage door on new footings, or plywood shear walls where there is enough solid wall, so the garage still works the way it does today. A structural evaluation decides which one fits. If the house also sits on a raised foundation with cripple walls, our guide to seismic retrofit in Los Angeles covers the bolting and bracing that usually goes with it.

 

Why One Team Beats Three

The traditional route is to hire an engineer, then a permit runner, then a contractor. Each handoff is a place where responsibility becomes negotiable, and on a mandatory retrofit with a compliance clock running, that is expensive. When the plan checker rejects a detail, the engineer says the contractor asked for it, the contractor says the engineer drew it, and the correction round happens regardless.

YD Group holds structural engineering, LADBS submittal and construction in the same office. One team is answerable for whether the set clears plan check and for whether the building gets built to it. On a deadline-driven ordinance project that is the difference between compliance and an extension request.

 

What to Expect From the Process

  • Structural assessment. A site evaluation and load calculations establish what your specific building needs. This is also where over-engineering gets ruled out.
  • Permit acquisition. Plan check, corrections and LADBS approvals are handled for you. Correction rounds, not the statutory review period, are what actually determine how long a permit takes.
  • Costing before construction. Scope is set against the engineering, so the estimate reflects the frames and concrete the building actually requires rather than a placeholder figure revised later.
  • Construction around your tenants. Work is sequenced to limit disruption. Expect noise and temporary loss of parking during working hours; in most cases tenants stay in place throughout.

Fully retrofitted buildings also tend to hold value better, attract tenants who care about the building being compliant, and can qualify for reduced earthquake insurance premiums once the work is documented.

 

Need Help With Soft-Story Retrofitting?

According to the Soft-Story Compliance Report, as of January 11th 2021, there are still around 13,000 soft-story buildings in Los Angeles. It’s necessary to take steps and prepare them for compliance. Unfortunately, in many cases, building owners face many roadblocks in the compliance plan, starting from identifying if the ordinance applies to their building, to finding the right company to help them with planning, permitting, and executing the construction.

Every building is a case for itself, and deserves maximum professional care. If your building still hasn’t complied, we offer you our help. Our experts will work with you to find a solution that ensures compliance to the ordinance, and brings maximum value for its budget.

YD Group can handle the entire process of analysis, planning, permitting, and construction. See our soft story retrofit services in Los Angeles for what that involves. Get in touch with YD Group via the contact form or call us directly, and let’s discuss how we can make your building stronger, safer, and prolong its longevity.

Share now

Link copied ✓

Fill out the form below for a free, no-obligation quote.

Stem Wall Foundation: How It Works in Older Los Angeles Homes

The Concrete Wall Under a Raised Floor Carries More Than...

Who Qualifies for the California ADU Grant for ADU Construction?

Building an Accessory Dwelling Unit in Los Angeles is one...

Earthquake Brace + Bolt (EBB) Program LA | Get Funded

Who Qualifies, How Much, and How to Apply Securing your...